Before you accept a builder’s quote, get it checked.
Independent quote reviews by experienced construction professionals — helping UK homeowners spot overpricing, vague allowances, missing scope and potential risks before committing to a builder.
Independent quote checks. No builder referrals. No sales agenda.
Typical turnaround: within 2 working days.
A cheaper quote is not always a better quote.
Two builders can price the same project very differently, but the difference is not always profit. Sometimes one quote includes more detail, clearer allowances, better specification, or fewer hidden assumptions.
BuildFairUK helps you understand what is actually included before you accept.
A structured review of the things that quietly cost homeowners the most.
- Missing or unclear scope
- Vague wording
- Exclusions
- Provisional sums
- PC sums
- VAT clarity
- Payment schedule
- Labour and material detail
- Building control assumptions
- Waste removal
- Access issues
- Pricing concerns
- Questions to ask before accepting
- Programme and timescale assumptions
How it works
Share your documents
Send us your builder's quote, along with any drawings or plans you have.
We review the detail
Our team examines the quote for missing scope, unclear wording, risky allowances and points worth clarifying.
You receive a clear report
You get a plain-English PDF setting out our findings and the questions to raise before you proceed.
Preview a sample Independent Quote Review
Before submitting your builder’s quote, you can view an example BuildFairUK report to understand the style, structure and level of detail you’ll receive.
The sample report shows how we highlight unclear wording, missing items, provisional sums, pricing considerations and practical questions to raise before committing.
“Allow £4,500 for kitchen — final to be agreed with supplier.”Extract from builder’s quote — item 7.2
This is a provisional sum, not a fixed price. A £4,500 allowance is low for a supplied-and-fitted kitchen and is likely to increase once the supplier is chosen. The quote does not specify worktop type, appliance allowance, or who is responsible for plumbing and electrical connections.
- • Worktop material and edge profile not stated
- • Appliance package — integrated vs freestanding
- • 1st and 2nd fix plumbing & electrical connections
- • Removal and disposal of existing kitchen
“Can the kitchen allowance be replaced with a fixed price once the supplier is chosen, and confirm exactly what’s included?”
Sample report is anonymised and for illustration only.
A plain-English review of your builder’s quote before you commit.
- Quote completeness review
- Missing or unclear item list
- Risk observations
- Pricing comments
- Questions to ask your builder
- Plain-English PDF report
Payment requested only after we confirm we can review your documents.
Common questions
Get a second pair of eyes — before you sign.
Independent quote checks. No builder referrals. No sales agenda. £99 flat fee.
Typical turnaround: within 2 working days.
